A hint about the project:

Nuweiba port is located in a distinguished location from Aquaba gulf ; being between east and west of arab peninsula ,in addition to its special economic situation privileges; being an international logistic center with a unique transport network mingled the project with strategic development and needs for a long term future Benefiting from the initiative of the belt and road (ElHarir road), that China launched in the year 2013and which aim at enlarging international trade through establishing  ports and roads networks and other utilities through may countries as Asia, Europe and Africa . Within the framework of future development strategy  and retrieving security status  in Arab region from the Egyptian side and setting Nuweiba port as a main exporting port for Syria and Iraq rehabilitation  planning development for a new city at Egypt and KSA.

Benefiting from the initiative of the belt and road (ElHarir road), that China launched in the year 2013and which aim at enlarging international trade through establishing  ports and roads networks and other utilities through may countries as Asia, Europe and Africa . Within the framework of future development strategy  and retrieving security status  in Arab region from the Egyptian side and setting Nuweiba port as a main exporting port for Syria and Iraq rehabilitation.

Project data Estimated cost Finance source


1-Location:

Nuweiba port- South Sinai governorate


2-  Project’s target:

Raising the efficiency of Nuweiba port and providing all logistic services within the framework of new free economic zone establishment strategy  at Nuweiba also establishing linking bridge between Egypt and KSA and new NEOM city at Saudi Arabia

Also economic and social development at Sinai , reinforcing commercial needs between Egypt and Jordan and building a joint logistic center between Egypt and Jordan to help in rehabilitating  Iraq and Syria


3-  Projects components:

a berth of length 500m and depth 15m with a total hinterland area of 290 thousand m2


4-  Required making a detailed feasibility study

500milliard dollars Partnership with private sector


multipurpose terminal at Nuweiba port
multipurpose terminal at Nuweiba port
multipurpose terminal at Nuweiba port