Project Description:

  • The project consists of a total area of about 273.7 acres, south of Alexandria port, , and backfilling work for the first phase of the project is currently underway, with the implementation rate reaching 75% until 4 March 2024.

Project objective:

  • Revitalizing river transport across the Port of Alexandria.
  • Maximizing the capacity for handling and storage spaces of Alexandria Port.
  • Alleviating the traffic burden on the port and the governorate and transferring it to the logistical hinterland that is directly connected to the coastal axis.
  • Maximizing the potentials of railway transportation by connecting to the railway lines that are currently in Alexandria port.
  • Enhancing the economic magnitude and the logistical importance of Alexandria Governorate at the national and international levels through value-added projects to be implemented within the framework of the project.