Current Nawat at Egyptian ports
  • Red Sea Next Sohail (El-Gabha) Start 6 September - Duration 13 day ، Summer
  • Red Sea Next Sohail (El-Zabrah) Start 20 September - Duration 13 day ، Summer
  • Mediterranean Sea Next El-Salib Winds Start 30 September - Duration 3 days ، Mostly rainy

Public tender with sealed envelopes inviting for the project of establishing, operating, maintaining and re-handing over of a multi-floor garage at Alex port:

  An invitation for a public tender to establish, operate, maintain and re-handing over a multi- floor garage using BOT system, for a period of twenty years  at Alexandria port and on an area of 15700m.