Current Nawat at Egyptian ports
  • Red Sea El-Wasm (El-Ghafr) Start 11 November - Duration 13 day ، Autumn
  • Mediterranean Sea Next Rest of El-Moknesa Start 22 November - Duration 4 days ، Rainy
Investment in Ports
Investment in Ports

Red Sea port authority

The Redsea Ports Authority 

The current Investment Projects 

1-   Establishing a multipurpose terminal at the Adabia Port

  1.  Establishing, operating and administrating the dry bulk terminal (grains) at the Adabia Port, supplied with the related silos and suction equipments  
  2. Establishing, operating and administrating the main container terminal to serve the southern region of Safaga 
  3. Establishing, operating and administrating the general cargo terminal at Portawik Port 
  4. Establishing, operating and administrating the cruise terminal and the world Marina of yachts at Sharm El Sheikh Port
  5. Utilizing, operating and marketing the World Trade Center at Hurgada Port
  6. The development project of El-tur Port
  7. Establishing a container terminal at the Adabia Port

The Medium-Term Investment Projects 

1-    The Project of establishing the Fifth Dock at Sukhna Port

2-     The Project of establishing a berth at the back of the northern berth at the Suez  Port

 


The Long- term Investment Projects 

The sixth dock project at The Port of Sukhna