Current Nawat at Egyptian ports
  • Red Sea El-Wasm (El-Ghafr) Start 11 November - Duration 13 day ، Autumn
  • Mediterranean Sea Rest of El-Moknesa Start 22 November - Duration 4 days ، Rainy
  • Red Sea Next El-Wasm (El-Zabana) Start 24 November - Duration 13 day ، Autumn
Investment in Ports
Investment in Ports

Alexandria port

Investment opportunities at Alexandria port

The current Investment Projects 

  1. The project of establishing the container terminal CT3 at berth 100 (the project was presented for a world public bidding on 29/3/2014 )
  2. The project of establishing, operating and administrating a grain terminal (berths- suction equipments - silos) (the project was presented for a world public bidding on 20/4/2014)
  3. The project of establishing, operating and administrating the unclean bulk terminal by a world environmental treatment, and transferring the coal terminal of Alexandria Port into it (the project was presented for a world public bidding on 20/4/2014)

The Medium-Term Investment Projects  

1-    The Project of establishing, operating and administrating  a multipurpose terminal (containers – general cargo)

Terms of  Reference brochure is currently  being  prepared for circulation

The Long- term Investment Projects 

  1. The project of establishing the middle port (a future strategic project)
  2. Terminals proposed to be established within the middle port are:
  • Service Terminal of the Hydrocarbon liquid bulk
  • Container  Handling Terminal
  • Agricultural Products Handling Terminal 1,2
  • Dry Bulk Terminal 1,2
  • Multipurpose Handling Terminal 1,2
  • Establishing , operating and administrating a world marina for yachts and a Special Logistic Zone