Current Nawat at Egyptian ports
  • Mediterranean Sea Next Kasem Start 4 December - Duration 5 days ، Extern storms
  • Mediterranean Sea Rest of El-Moknesa Start 22 November - Duration 4 days ، Rainy
  • Red Sea El-Wasm (El-Zabana) Start 24 November - Duration 13 day ، Autumn

The current status of some of these studies and the entities that can benefit from them - Studies related to maritime transport activities

The five-year plan number Studies to be updated Studies to benefit from Studies implemented and beneficial Bodies benefiting from the studies Required updating proposals
First Draft study on local steel factories needs from scrap and vessels wastes (1986)     *Local steel factories.
*Egyptian navigational companies.
*vessel breaking industry.
After factories and shipyards have been privatized, vessels repairing companies and shipyards have joined the Ministry of Defense, updating became indispensable
Fourth Study the activities related to maritime transport and industries related to maritime transport and the ways of updating it (October 2000.     *Imports.
*Maritime agencies.
*vessel repair.
*Towage, pilot age and storage.
After privatization of such activities it is indispensable to update the study to acknowledge the effect of such developments on national economy.
    Study the growth of Egyptian foreign trade through containers transport (export-import) and its impact on increasing the transport demand on containers shipping(January 2000) *container handling companies.
*Egyptian port authorities.
*Customs.
*Inland transport.
*Storage companies.
*Shipping companies.
After the privatization of these activities, Studies are to be updated to acknowledge the impact of the development of such activities on the national economy.