Current Nawat at Egyptian ports
  • Mediterranean Sea Next Kasem Start 4 December - Duration 5 days ، Extern storms
  • Mediterranean Sea Rest of El-Moknesa Start 22 November - Duration 4 days ، Rainy
  • Red Sea El-Wasm (El-Zabana) Start 24 November - Duration 13 day ، Autumn

First: Studies undertaken through the Maritime Transport Division

  • The sedimentation phenomena in Damietta harbor (1988).
  • Linking all types of inland transport networks with Egyptian ports (February 1995).
  • The storage capacity on the State's level and it effect on port traffic productivity and efficiency (1995).
  • The development of transit cargo traffic in Egyptian ports (July 1996).
  • Planning the storage transit activity in Egyptian ports (1997).
  • The requirements of wastes and ballast water reception facilities and the prevention of marine pollution in Egyptian ports.

Second: Studies undertaken outside the Division

  • Pricing the port services in Egypt (May 1997).
  • Development of Egyptian ports hinterlands (August 1997).
  • The operation of feeder vessels to transport transit containers between Egyptian ports (February 2001).
  • The impact of container ports in the Middle East and South Western Asia on the Egyptian ports (July 2001).
  • The world maritime alliances between shipping companies and their impact on Egyptian ports (September 2001).
  • Restructuring of Egyptian ports (April 2002).
  • The establishment of a distribution center in Damietta port (December 2002).
  • The assessment of the operation contracts of the new ports (East Port Said – North El Sokhna) (April 2003).
  • The assessment of the financial sufficiency of Egyptian ports within the framework of the Landlord system (March 2004).
  • The establishment of a marketing department in Alexandria port.
  • The consideration of the impact of East Port Said container terminal on Egyptian ports (June 2004).
  • The maritime transport in East the Mediterranean and the pivotal role that Egypt plays. (May 2006).