Current Nawat at Egyptian ports
  • Red Sea El-Wasm (El-Ghafr) Start 11 November - Duration 13 day ، Autumn
  • Mediterranean Sea Rest of El-Moknesa Start 22 November - Duration 4 days ، Rainy
  • Red Sea Next El-Wasm (El-Zabana) Start 24 November - Duration 13 day ، Autumn
About Maritime Transport Sector
About Maritime Transport Sector

Responsibility

Information included or provided by the site its only purpose is giving general information and it is provided by the Maritime Transport Sector, although we are after the updating and accuracy of information, yet we do not make any declarations or commitments of any kind: with regards to perfection, accuracy, compliance neither for the site provision of information, products, services or others connected to the site for any purpose. Thus your reliance on such information is your own responsibility, we have no responsibility whatsoever of any loss or harm:  amongst which any following or indirect loss or harm as a result of data lost or profit loss or site usage. However, you can reach other internet sites through our site which are not under the Maritime Transport Sector umbrella, where we have no control over the nature on content of which.   Anyhow the existence of any links on our site does not necessary mean that we support or confirms their expressed point of view. We have exerted all possible efforts to keep the site working in a right flexible way. Yet the Sector has no responsibility and will not be exposed to any claims for temporary unavailability of the internet site resulting of technical problems out of our control.   


Information Services

The Egyptian Pound Against Foreign Currencies

58.355

46.635

45.774

24.901

23.254

20.752

17.6

13.779

4.792

4.693

4.585

2.657

2.089

0.157