يوم إفريقيا 2020 | رئيس الاتحاد الإفريقي سيريل رامافوسا يقود الاحتفالات الافتراضية

Current Nawat at Egyptian ports
  • Red Sea Next Al-Tharaya Start 7 June - Duration 13 day ، Summer
  • Mediterranean Sea Next El-Nokta Winds Start 18 June - Duration 2 days ، Hot
  • Red Sea Next Al-Tharaya (Al-Bateen) Start 25 May - Duration 13 day ، Summer
Commercial Ports
Commercial Ports

Navigation

Pilotage

Pilotage is compulsory in petrol doc

Pilot data

Pilot Rank Number of pilot each rank
Third pilot 1

 

 

Berths

Detailed Berths Information

Berth Type Length (m.) Depth (m.)
General Cargo Berth 75 5
Total
1 75 5

IMO Secretary-General

Tackling COVID-19 a voyage together

Achievements